We’re building it!!
-
Reservations have begun!

After 3 years of planning, approvals, funding, building, we have reservations on the books! Actually, one of them is a wedding, which I wasn’t even advertising for. It was always our plan to do events also, and we oversized the water system, septic and electrical system for that reason, I just didn’t realize the demand,…
-
San Juan Backcountry Lodge is now available to book on Vrbo and through the website!

First, I’ll give an update on the actual build, then advertising. The sheetrock is done, walls are painted, the deck and siding are over half done and we’re just about done with the flooring. After the flooring, we’ll move onto tile in the showers, cabinets, finish plumbing and electrical, etc… We’ve done all of this…
-
The foundation is done. We poured 60 yards of concrete, at 10,400ft, without a cement truck!!

We’re currently done with the foundation. To date, we have poured 60 yards of concrete without a cement truck, that’s 240,000 lbs of concrete, or 120 tons, at 10,400ft. And we did that in about a month. For the floor we poured another 10 yards with a cement truck. After doing the footings and walls…